[Draft 1] Season 10 Specification

SUMMARY

This is Draft 1 of the BanklessDAO Season 10 Specification.

Please review the proposed timeline for Season 10 and provide any feedback regarding the dates. If a change in dates is desired for any of the Season 9 milestones, please open discussion in the comments so that any updates can be reflected in a second draft.

Some Quick Reminders

  • Seasonal Specifications are not to handle funding requests. Any organizational unit requesting funding should go through the Seasonal Budget Request process and be reviewed by the Grants Committee.
  • Any changes to governance would need to be proposed with their own individual bDIPs (bDIP Template here.

The Seasonal Specifications are simply general operational specifications that allow organizational units to plan for the following season. While the Operations Department will manage the specifications we want as much input from DAO Members as possible so as to make decisions that align with members.

Remaining Season 9 Operations Timeline

DAO Operational Timeline [Notion link]

  • November 12-25: Grants Committee to work with groups to review funding requests
  • November 19: Draft 1 of the Season 10 Specification to be posted to the Forums
  • November 26 - December 9: Season 9 Grants Committee Election applications accepted
  • December 10: The Season 10 Grants Committee election will be posted to Snapshot
  • December 10: The Season 10 Specification will be posted to Snapshot
  • December 10: The Season 10 Budget Request will be posted to Snapshot
  • December 17: Last day of Season 9
  • Annual Break: December 18, 2023 - January 1, 2024 (15 days)

Operational/Governance Changes

These changes have been proposed and have independently passed a vote on the Forum and Snapshot during the current season. The vote on this Seasonal Specification will not impact the results of these previously-passed proposals.

  • Seasonal Meta-governance delegation to DAOStewards.eth
    • Snapshot
    • DAOStewards was renewed as the official meta-governance group of BanklessDAO for Season 9, enabling the BanklessDAO Vault Multisig to delegate eligible governance tokens to DAOStewards upon request. DAOStewards will report back to the DAO at the end of each season and propose to renew the delegation.
  • Tokenomics - Approve DAI Capital Efficiency Strategy
    • Snapshot
    • Idle BanklessDAO Vault DAI was deposited into the DAO’s Rari Fuse pool to earn 6.53% APY.

Community-Indicated Direction

These temp-checks have been posted on the Forum for discussion and voting, but their details are not ready for immediate implementation. This list indicates new experiments and directions the community is considering taking, but specifics are still being worked out. The vote on this Seasonal Specification will not impact the results of these discussions.

If this seasonal specification proposal passes Snapshot, the following timeline will fall into place for Season 10:

Season 10 Operations Timeline

DAO Operational Timeline [Notion link]

  • January 2, 2024: Season 10 begins
  • Week 1 or 2 : The Season 10 Kick-Off Event will be held on Twitter
  • March 4: Funding Request Reminder will be announced
  • March 17: All funding requests from guilds, departments, and projects to be posted to the Forum for the Grants Committee to review
  • March 18-31: Grants Committee to work with groups to review funding requests
  • April 1-7: Draft 1 of the Season 11 Specification to be posted to the Forums
  • April 1-14: Grants Committee to work with groups to finalize funding requests
  • April 1-14: Grants Committee Election applications accepted
  • April 8-14: Draft 2 of the Season 10 Specification to be posted to the Forums
  • April 15: The Season 11 Grants Committee election will be posted to Snapshot
  • April 15: The Season 11 Specification will be posted to Snapshot
  • April 15: The Season 11 Budget Request will be posted to Snapshot
  • April 22, 2024 : Last day of Season 10
  • April 23-29: Season 10-11 Break (7-day gap)

The Poll

  • Yes, I approve this Specification
  • No, I reject this Specification
  • Abstain
0 voters

If you do not approve, please feel encouraged to open discussion in the comments below. This is a draft, so there is still time to incorporate changes and suggestions. A second draft, if needed, will be posted on December 3, 2023 for a final vote.

4 Likes

This spec dates look off to me. I think there are some mistakes here.

For example, this was in S9 spec and is still here. Meanwhile, by this time, funds for S10 should have been disbursed.

So i don’t know if we can look into it and come up with a revised version.

1 Like

Hi @Paulito, thanks for taking a look. I’m not sure how they’re off, do you have a more specific reference?
The dates used here are based on bDIP-07(Snapshot), so for example, the March 4 Funding Request Reminder would be for Season 11 as all Season 10 funding would have been requested in Season 9 and disbursed at the beginning of Season 10.

1 Like

In that case this is the only correction then this should be 11 instead of 10.

2 Likes

I just took another look i missed it up i have pointed what i felt need to be corrected above.

2 Likes

Small typo here - should say Draft 2 of the Season 11 Spec. :nerd_face:
oh woops this was already pointed out - sorry.

2 Likes

gm @Rowan, from S10 onwards projects do not need to post funding request on the forum when the season changes unless they really need to. We’ve switched now to ad-hoc based project funding, they can request on a ongoing basis depending on the fulfillment of KPIs and needs.

3 Likes

Thank you @Paulito, @Trewkat, and @Ornella for taking the time to review in detail! I will make sure these changes are reflected Draft 2 of the Spec. :pray:

3 Likes